Water System Logbook

Texas · small ground water systems

Texas chlorine residual requirements

Regulator: Texas Commission on Environmental Quality (TCEQ) · Reviewed September 28, 2026

Short answer

Texas requires every public water system to disinfect ground water before distribution and to keep at least 0.2 mg/L free chlorine (or 0.5 mg/L chloramine, measured as total chlorine) at the entry point and throughout the distribution system. Small ground water systems check the distribution residual at least once every seven days and with every bacteriological sample, and record it on the quarterly DLQOR.

Minimum residual
0.2 mg/L free (0.5 total as chloramine), entry point and distribution
How often
Weekly in distribution (<250 connections and <750 people), plus with each coliform sample
Report
DLQOR (TCEQ-20067), quarterly by the 10th

Who has to chlorinate

Minimum residual

Maximum

How often to test

Test kits and methods

Reporting

How long to keep records

Parks, campgrounds and seasonal systems

Keeping the log in Texas

A weekly distribution reading plus one with each coliform sample is the minimum for a small Texas system. Many operators check daily anyway, because a feed problem caught on day two is easier to explain than one found on day seven. Whatever the frequency, each reading needs the date, time, location and result so it can go straight onto the DLQOR.

Print a dated month with the chlorine residual log sheet, or build a sheet for your whole round with the daily water system log sheet.

Other states

For federal rules and every state's program, see chlorine residual requirements.

Sources

  1. 30 TAC §290.42(e) — Disinfection
  2. 30 TAC §290.110 — Disinfectant residuals
  3. TCEQ — Disinfection Level Quarterly Operating Report
  4. 30 TAC §290.46 — Minimum acceptable operating practices
  5. TCEQ RG-407 — Completing the DLQOR

Last reviewed September 28, 2026. Rules change and states add their own; confirm with your state drinking water program.